

📅 Elevate your project game — plan smart, stay ahead!
This Compact Size Project Planner is tailored for Franklin Covey Compact notebooks and similar 6-hole systems, measuring 4.25" x 6.75". It includes 50 sheets printed on premium 120gsm true white paper that prevents ink bleed-through. The planner features dedicated sections for project details, tasks, responsibilities, and milestones, all on a silky-smooth surface. Its precise 6-hole punch spacing ensures perfect compatibility, making it a top choice for professionals seeking organized, efficient project management.
| ASIN | B07NZD7BBH |
| Best Sellers Rank | #51,729 in Office Products ( See Top 100 in Office Products ) #182 in Planner Refills |
| Brand | Handy Forms |
| Cover Material | Paper |
| Customer Reviews | 4.5 4.5 out of 5 stars (328) |
| Date First Available | February 23, 2019 |
| Item Weight | 4.2 ounces |
| Item model number | FCC112 |
| Manufacturer | Handy Forms |
| Manufacturer Part Number | FCC112 |
| Material Type | Paper |
| Package Dimensions | 6.73 x 4.25 x 0.28 inches |
| Sheet Size | 4.25" x 6.75" |
| Size | Project Planner |
J**E
Looking for true white paper and good quality, this is it.
I was skeptical on ordering any A6 paper that has a claim of being white. I have ordered at least 5 different times expecting it to be white but turned out beige or cream so I was will pleased when this product came in and it was a true white. No complaints on the quality of the product. Perfect weight and the size is true to what is advertised. I would highly recommend this product.
T**T
Love these/ great quality
Love these. Have used for years.
K**B
Fits Franklin Covey Compact Perfectly
I inherited a compact Franklin binder and wanted to use it as a bullet journal instead of getting the official refills. I found these and decided to give it a shot. I actually love this paper. It's thick enough to handle fountain pen ink without bleed through. And the dots are just dark enough to use as a guide and for creating my own layouts. These fit my Franklin Planner perfectly. My only wish is that they were a bit less expensive. Though it may not be an issue as I don't know how many I'll use per month. Recommended!
P**O
Fountain-Pen friendly and versatile!
These pages are just what I need. I have a compact Franklin Planner, but I do NOT like Franklin Covery pages. Their paper is cheap and fountain. pen ink bleeds through. Further, unless you order an entire year of pages at the beginning of the year, they will not guarantee they will ship the pages you want - I ordered a quarter-pack and ended up with a floral pattern that I did NOT want. These pages have none of those problems. They are blank, thick, and very friendly to fountain pens, even the wettest broad nibs. Sure, you have to write in the date, and a few border lines, etc. but that's not a problem for me because i like using my fountain pen. Moreover, if you only fill half a page on a given day, you can simply draw a line and use that same page on the following day. With a Franklin Covey page, if you don't use all the page on one day, that page is wasted.
D**R
Just right
Just expected as
K**7
High quality laker
Great quality thick paper but the line spacing is too wide compared to my FC compact inserts. I can’t get many notes on these pages because the spacing is just too big, so I wind up using more than I intended to take notes in meetings or etc. But the paper is super thick, very bright white, and feels high quality. Almost like card stock. I just don’t like the line spacing for my needs.
J**E
Perfect paper for my planner!
I bought a custom made personal sized planner by #sundaydots, and it's made a little wider than the reg. personal sized planners. So I have been looking for plain, ruled, notebook paper to put in it, that would fit and look good. (I find that the personal sized paper is so narrow) and give alittle more writing space. I came across this Franklin Covey compact sized paper pack, and decided to try it out. I love it, it was the perfect size, the weight of the paper was a bonus surprise. I liked it so much I've ordered it twice and have added it to my cart for a third time. Great size, great thickness, and perfect for my decorating and notes! Perfect for me.
N**D
Just what I needed
I cannot get the financial (check register) replacement pages for my older (Franklin) planner any longer...the same about address replacement pages. I have found that if I purchase blank pages, I can run whatever amount of them through my printer-copier, using one of my (unused) printed pages for the master, and have more printed pages on supply. These right-size blank pages will work great, needless to say.
R**D
Spaced too wide
Trustpilot
1 dag geleden
3 weken geleden